Real Estate 18
The construction of a new residential district
Some extra photos to
Real estate 17
(photos 2017-1) with details of brickwork. The gap between inner and outer wall is filled with thermal isolation mats. Windows and door entries have temporary panels covered with fabric.
1
2
3
4
5
(c)BAP | Mar 18, 2017