Real Estate 12
The construction of a new residential district

 
Some extra photos to Real Estate 11 (Photos 2016-2) to show how concrete pillars are made.

A prefabricated steel armature is erected first and a plywood shape is put around it. The plywood is supported by a rig as shown in photo 1. Concrete is poured in from the top, where a man can stand to guide the process, hence the railing.

 
1
 
 
2
 
 
3
 
 
4
 
 
In photo 2 three pillars are prepared to be constructed on top of a ground beam. When the concrete is hardened the rig and the plywood are removed, with the result in photo 3. Walls are constructed in a similar way (photo 4).

Photo's 2 and 3 were also shown in Real estate 10 (Photos 2016-2 section).