The 'Demolition' series documents the pull-down of an apartment complex to be replaced by a new housing estate. The photos below are taken one week after 'Demolition 4' [1].

In this final stage only the tower with the stairways is still standing. The building is literally cut to pieces with an hydraulic shear on a crane while water is sprayed to minimize spreading dust around (photo 2, 3).


 
1
   
2
   
3
   
4
   
Two days later it's gone (photo 5). The concrete rubble is further reduced to smaller pieces to get rid of the steel and recycled.

 
5
   
[1] 'Demolition 5' is the last part of this series. All 5 parts can be found in the Photos 2015-1 section.